Canning Street, The Range - Roadworks
Roadworks are continuing in Canning Street between North Street and Cambridge Street, The Range. The works to be undertaken will include the installation of stormwater drainage, reconstruction of kerb and channel and road pavement, construction of concrete paths and centre medians, placement of new asphalt surfacing, and installation of signage and line marking.
Announcement : During this time, Canning Street will be reduced to a one-way road with the travel direction from North Street towards Cambridge Street. A temporary lane closure and detour at the intersection of Canning Street and Albert Street will be in place, requiring all Albert Street traffic to turn left only.