Council Services > Building and Plumbing > Plumbing Applications
I want to...
Plumbing Applications

Plumbing Applications

Plumbing and Drainage Application Checklist

The Sewered Area Checklist / Non Sewered Area Checklist and On-site Treatment Facilities Checklist have been developed to assist in the preparation of plumbing and drainage applications to Rockhampton Regional Council.

If all of the items contained in the checklists are included with the application and associated plans contain the detail demonstrated by the Sewered Sample Plan, Non Sewered Sample Plan plus Sample On-Site Treatment Facilities Site Plan, applications will be assessed quickly and without the need for additional 'Information Requests'.

User Guide

  1. The checklists provide applicants with a list of the documents to be submitted as part of an application.
    1. Tick the relevant box on the left hand side of the checklist once you have the completed documentation attached.
  2. Each checklist also provides a list of the detail and information to be contained in each of the documents.
    1. Tick the box on the right hand side of the checklist once each of the requirements has been satisfied.
  3. Please attach the fully completed documentation to the relevant checklist.
  4. The full application can then be submitted and associated fees paid at Rockhampton Regional Council customer service offices at:
  • 70 Anzac Parade in Yeppoon, 
  • City Hall at 232 Bolsover Street in Rockhampton;
  • 1 Ranger Street, Gracemere; or
  • 32 Hall Street, Mt Morgan

    Checklist and Sample Plan User Guide
    Application Checklist for Sewered and Non-Sewered Areas
    On-Site Treatment Facilities Checklist
    Example Plumbing and Drainage Design for Sewered Areas
    Example Plumbing and Drainage Design for Non-Sewered Areas
    Example On-Site Sewerage Facility Design - Non-Sewered Areas
    How Do I Terminate The Heated Water Unit Temperature Pressure Relief Valve Drain Line
    Underslab Sanitary Drainage Checklist
    Underslab Sanitary Drainage Design Sheet 1
    Underslab Sanitary Drainage Design Sheet 2
    Swimming Pool Checklist
    Solar/Heat Pump Inspection Checklist 

    Current Plumbing and Drainage Forms - Department of Infrastructure and Planning Queensland Website Links

    These are mandatory forms prepared by Department of Infrastructure and Planning Queensland and State Government prepared plumbing information sheets and link to plumbing laws.
    Who's Doing Your Plumbing?
    Plumbing Forms
    Plumbing Fact Sheets
    Plumbing Laws  

    Hot Water Matrix
    Hot Water Matrix - Domestic
    Hot Water Matrix - Commercial

    Information about how to use the matrix is below:

    1.  Is this work Domestic or Commercial? Go to Domestic or Commercial Sheet 
    2.  Is this a new construction or work on an existing building?  Go to appropriate rows in Column A 
    3.  Is the HW unit replacing the existing heater in the same location, a different lcoation or was there no hot water in the building?  Go to appropriate rows in Column B 
    4.  Is this work in a Gas Reticulation Area or Non Reticulation Area?  Go to appropriate row in Column D, MARK THIS ROW 
    5a   Ask for type of heater existing. Eg. Electric Resistance Storage, Gas Instantaneous, etc.   
    5b 

    Ask for type of heater proposed for installation. Eg. Electric Resistance, Gas Storage, Heat Pump, Roof Mounted Solar, Split System Solar or Gas Instantaneous.

    When proposed is different to existing choose NEW (type of heater). When proposed is the same type, choose REPLACEMENT (type of heater). 

    Choose appropriate COLUMN according to proposed heater type
    6.  Where selected ROW and COLUMN intersect, Statutory requirements are stated.   

    Rockhampton Regional Council
    232 Bolsover Street, Rockhampton
    PO Box 1860 Rockhampton Qld 4700
    enquiries@rrc.qld.gov.au

    Disclaimer and Privacy

    Our other sites: